| Fairwinds has worked on a variety of projects ranging from Deep Water to Coastal Waters, Swamps and Onshore. Below are some featured projects that cover a variety of engineering disciplines. To see a more comprehensive list of projects, click our representative projects on your below.
|
Case Studies | | Major Projects | | Fairwinds' was engaged by a major independent E & P company to manage a major fast track project. The project included a new-build four-pile jacket and refurbished topsides and facilities weighing over 1600 tons.
| | Single Well Developments | Fairwinds routinely provides single well development assistance to independent O&G customers in Federal and State waters. A typical project involves the development and installation of production facilities required to produce hydrocarbons from a single successfully completed well along with the associated pipelines. | | Inland & Swamp Facilities | In the environmentally sensitive wetlands of the Atchafalya Basin in South Louisiana, Fairwinds provided the engineering, CAD (Computer Aided Drafting), purchasing, construction project management & inspection services required to construct and commission a new O&G facility and pipeline for Century Exploration New Orleans, Inc.
| | Transportation | Fairwinds was engaged by Nucor Corp to support the relocation of a steel mill from Louisiana to Trinidad. Fairwinds provided the engineering design analysis needed to ensure that large components remained structurally sound during yard transportation. Fairwinds provided the tie down design and transportation study.
| | Field Optimization Studies | Fairwinds experience and in-house state of the art design software (PIPESIM) have provided assistance to many independent O&G customers in the development of due diligence studies covering the purchase of O&G properties, de-bottlenecking reviews, & field optimization studies.
| | Deep Water Pipeline | Fairwinds International has had an important role in the development of Deep Water projects. Our project management team played a lead role in the interface management, installation and commissioning of both the Medusa and Front Runner pipelines and systems.
|
|
|
| |