Fairwinds project management and inspection experience played
an important role in the development of the Medusa and Frontrunner
Deep Water pipeline projects.
Our
project management team had a lead role in the interface
management, installation, commissioning and DOT documentation
of both systems. The projects included the S-lay of oil and
gas pipelines, installing of in-line Wye assemblies, hanging
of SCR's at the SPAR structure and retrofit of risers and
tie-in-piping and systems at the receiving platforms.
The pipelines were S-laid in water depths ranging from 300
to 3300 feet. Inline Wye assemblies were installed on the
SCR's prior to hanging on the SPAR hull at an approximate
depth of 600 feet.
Our team worked closely with all project partners and was
in charge of tracking, generating, reviewing and approving
specifications and drawings. Fairwinds was responsible for
managing the offshore installation of the pipelines including
onboard QA/QC tracking and pipeline inspection services.
Our project management and field inspection team was tasked
with the planning, contracting, field supervision and final
reporting for the commissioning of both pipelines. Detailed
commissioning procedures and drawings were generated for
each stage of work. Upon completion of the commissioning,
documentation was prepared and submitted in accordance with
DOT requirements.
|